98 Avenue Slope Repair

Last updated on
Image
View of repaired slope from top of the slope
Project type
Environment
Project status
Completed
Address
25300 block of 98 Avenue

Repairs and upgrades have been completed to a natural slope destabilized by a series of heavy rain events.

Stone was placed along the slope and reinforced with plantings to strengthen the slope and provide a route for rain runoff. The affected segment of road was also reinstated.

ISL Engineering and Land Services Ltd. designed the project and Blackline Site Works constructed the project. Construction was completed in April 2025.