A feasibility study will be conducted with a consultant team to assess possible locations for a bridge crossing the North Alouette River. Assessing a North Alouette River crossing was identified as a priority in the Trails Improvement Plan published in January 2025.
The objective of this work is to determine the most feasible location for a trail bridge across the North Alouette River, assessing a number of factors include the environment, access, slopes, costs, geotechnical and constructability. The bridge will connect the two sides of the Silver Valley Trails network, improving trail connectivity for local recreation. The bridge location must meet the needs of multiple groups of trail users including pedestrians, cyclists and equestrians, while minimizing disturbance and impact to the North Alouette River wherever possible.
Bridge location options will be analyzed based on a variety of factors including connection to existing trails, accessible grades, environmental impact, engineering considerations, land ownership and cost.
This feasibility phase does not include detailed design or bridge construction.
Timeline: November 2026 - April 2027