
The City of Maple Ridge has completed construction of a 3 m multi-use path
on 117 Avenue from 207 Street to Laity Street and on Laity Street from 117 Avenue to Lougheed Highway.
The project included construction of an asphalt multi-use path, streetlights and traffic calming features. The pathway is located on the south side of 117 Avenue and the east side of Laity Street, connecting to the existing multi-use path on Lougheed Highway.
Aplin & Martin Consultants Ltd. designed the project. Crown Contracting Limited constructed the project. Construction was completed in the summer of 2023.