Dewdney Trunk Rd Watermain (216 St to 222 St)

The City is replacing the watermain and re-lining the sanitary sewer on Dewdney Trunk Road (Dewdney) from 216 Street to 222 Street. The work generally consists of installation of approximately 1380m of ductile iron (DI) watermain, 980m of sanitary sewer re-lining, reconnection of existing service connections, installation of new fire hydrants, installation of fibre optic ducting on the existing watermain and surface restorations.

Sandpiper Contracting LLP has been awarded the contract and construction commenced in September, and is anticipated to be complete by the end of February 2021. The hours of work will be from 7:00 am to 5:00 pm Monday to Friday and occasionally on Saturday as necessary.

In order to accommodate rush-hour traffic, Dewdney Trunk Road will maintain two westbound travel lanes from 7:00 am to 9:00 am (with one eastbound lane), and two eastbound lanes from 3:00 pm to 5:00 pm (with one westbound lane).  All travel lanes will be reinstated after working hours.

BUS SERVICE: There will be intermittent bus stop closures during the installation of new water service connections. No more than one bus stop will be closed at one time. TransLink is aware and will be posting signage at the affected bus stop as needed with direction to the nearest available stop.

Every effort will be made to provide advance notice to area residents for the schedule of water and sanitary sewer service interruption for reconnection to minimize the inconvenience.

Should you have any questions regarding this project, please contact the City of Maple Ridge Project Manager, Velimir Stetin at 604-467-7495. Please plan for detours and thank you in advance for your patience during construction.